Interactive case · Europe

Can we deliver in 9 days?

Follow one order for 600 units from the customer back to the supplier.

Projected lead time
Combine conditions

SAP documents and data
Document flow
Data and planning rules
Governance and AI

SCM review. Functional owners validate and approve values. Data stewards record changes and effective dates. SCM follows up on exceptions and checks the next planning run. Use rules for required fields and valid references. Check AI forecasts against the current baseline.

How the estimate works

The example adds the activated stages on a single sequential path using elapsed hours. Pack starts when Bulk is available and its modelled queue has cleared. Released buffer stock removes supplier, Bulk production and new Bulk inspection time for this order. Those steps still replenish the buffer. In this example SAP QM creates a goods receipt inspection lot. QC records the results and QA records disposition under the site procedure. The Bulk hold adds 12 h before a successful disposition. The longer Pack queue adds 8 h before the line starts and leaves machine hours unchanged. Packaging materials are assumed available.

For a real schedule, use operation relationships, lot sizes, actual material availability, shift calendars, competing load and release times. If branches run in parallel, a successor waits for the last required input rather than adding all branch times. This estimate illustrates a forward calculation, not an SAP availability check or a confirmed delivery date.

Test a master-data value

When a maintained field gives the wrong answer

Compare a stored value with evidence from recent operations.

Evidence and assumptions

SAP documents how standard values and resource formulas can support costing, scheduling and capacity planning. A value maintained for a cost estimate may need a separate check against current line performance before it is used to schedule a job. Research documents stale planning data in some manufacturing settings. The example values are illustrative.

Trace the SAP documents
Upstream demand flow
SAP systems, data and assumptions

SAP ERP · Execution

The source of record for sales orders, purchase orders, production orders and postings. The example uses make-to-stock and models the warehouse as a separate plant.

MARA and MARC

MARA holds general material data, such as material type (MTART) and base unit of measure (MEINS). MARC holds plant-specific data, such as MRP type (DISMM), planner (DISPO), procurement type (BESKZ), special procurement (SOBSL) and planned delivery time (PLIFZ).

This example uses illustrative document numbers and standard SAP examples. Transactions and postings depend on system configuration.